subject
Mathematics, 26.10.2020 16:40 whatsittoya4261

One machine can complete a production run at a factory in 46 hours. Two machines can complete the production run in 25 hours if they work-together. How long would it take the second machine to complete the production run if it had to do the job by itself?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:50
How many zeros does the function f(x)=4x3-x2+1 have
Answers: 1
question
Mathematics, 21.06.2019 18:00
The base of a triangle exceeds the height by 7 centimeters. if the area is 400 square centimeters, find the length of the base and the height of the triangle.
Answers: 1
question
Mathematics, 21.06.2019 22:00
Worth 100 points need the answers asap first row -x^2 2x^2 (x/2)^2 x^2 x is less than 2 x is greater than 2 x is less than or equal to 2 x is greater than or equal to 2 second row -5 -5/2 4 5 •2 is less than x& x is less than 4 •2 is less than or equal to x & x is less than or equal to 4 •2 is less than or equal to x& x is less than 4 •2 is less than x& x is less than or equal to 4
Answers: 2
question
Mathematics, 22.06.2019 00:10
What 8/12+8/11 in another way than and improper fraction
Answers: 2
You know the right answer?
One machine can complete a production run at a factory in 46 hours. Two machines can complete the p...
Questions
question
Mathematics, 11.04.2020 13:31
question
Geography, 11.04.2020 13:31
question
Social Studies, 11.04.2020 13:32
question
Mathematics, 11.04.2020 13:33
Questions on the website: 13722362