subject
Mathematics, 25.10.2020 05:00 Oliviapuffinburger33

A project under consideration has an internal rate of return of 13% and a beta of 0.8. The risk-free rate is 3%, and the expected rate of return on the market portfolio is 13%. a. What is the required rate of return on the project? (Do not round intermediate calculations. Enter your answer as a whole percent.) b. Should the project be accepted? c. What is the required rate of return on the project if its beta is 1.80? (Do not round intermediate calculations. Enter your answer as a whole percent.) d. If project's beta is 1.80, should the project be accepted?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
Name each raycalculation tip: in ray "ab", a is the endpoint of the ray.
Answers: 2
question
Mathematics, 21.06.2019 23:30
Which graph represents the same relation is the sa which graph represents the same relation as the set {(-3-2)}
Answers: 3
question
Mathematics, 22.06.2019 02:30
Atriangle has side lengths of x, x+11, and 3x+5. what is the perimeter? a. 3x^2 + 38x + 55 b. 4x + 16 c. 5x + 16 d. 3x^3 + 38x^2 + 55x
Answers: 1
question
Mathematics, 22.06.2019 03:00
Which statement is true about the local minimum of the graphed function? over the interval[-4,-2], the local minimum is 0. over the interval [-2,-1] , the local minimum is 25. over the interval [-1,4], the local minimum is 0. over the interval [4,7], the local minimum is -7
Answers: 2
You know the right answer?
A project under consideration has an internal rate of return of 13% and a beta of 0.8. The risk-free...
Questions
question
Physics, 02.07.2021 15:50
question
Mathematics, 02.07.2021 15:50
question
Mathematics, 02.07.2021 15:50
Questions on the website: 13722360