subject
Mathematics, 23.10.2020 20:50 KingD3474

A company found that an experienced surveyor can survey a roadbed in 6 hours. An apprentice surveyor needs 10 hours to survey the same stretch of road. If the two work together, find how long it takes them to complete the job.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
Given: x + y = 6. if xe (-15, -6, -1), then which of the following sets of ordered pairs are solutions? © {(-15, -21), (-6, -12), (-1, -7)} [(-15, 21), (-6, , 7)} {(-15, 21), (-6, 12), (-1, -7)}
Answers: 2
question
Mathematics, 21.06.2019 18:00
He that is measured at 220° is a reflex angle. the opposite angle is obtuse. find the measure of obtuse .
Answers: 1
question
Mathematics, 21.06.2019 18:50
Determine if the function below is continuous. a. continuous b. not continuous, 1 hole c. not continuous, > 2 holes d. not continuous, 2 holes
Answers: 1
question
Mathematics, 21.06.2019 19:00
What is the correlation coefficient between the variables? round to three decimal places. enter your answer in the box
Answers: 2
You know the right answer?
A company found that an experienced surveyor can survey a roadbed in 6 hours. An apprentice surveyor...
Questions
question
Mathematics, 14.07.2019 10:30
question
Mathematics, 14.07.2019 10:30
Questions on the website: 13722361