subject
Mathematics, 19.10.2020 14:01 Kriszzznizzle

An offshore wind turbine is 3km off the shoreline. The power operator is 7 km down the coast to the east of the turbine. For the electricity generated by the turbine to make its way to the power operator, the turbine must be connected to distribution lines and then to the network transmission lines located at the power operator. If laying the distribution lines cost twice times as much under water as it does on land, what path should the distribution lines follow in order to minimize the cost?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
What number should be added to both sides of the equation to complete this square? x^2-10x=7
Answers: 3
question
Mathematics, 21.06.2019 15:30
Will give are given that xy is parallel to zw. if xz is a transversal that intercepts xy and zw, angle angle alternate interior angles. since xy is parallel to zw, we know that these angles are we also know that angle xvy and angle zvw are , and thus congruent. we can conclude that â–³xyv ~ â–³zwv using the similarity theorem.
Answers: 2
question
Mathematics, 21.06.2019 18:40
What dimensions can créate more than one triangle ?
Answers: 1
question
Mathematics, 21.06.2019 19:00
The fraction 7/9 is equivalent to a percent that is greater than 100%. truefalse
Answers: 1
You know the right answer?
An offshore wind turbine is 3km off the shoreline. The power operator is 7 km down the coast to the...
Questions
question
Mathematics, 29.08.2019 10:30
question
Mathematics, 29.08.2019 10:30
Questions on the website: 13722363