subject
Mathematics, 17.10.2020 21:01 Ksedro1998

Profit is the amount of money that remains after all expenses of a project have been paid. Acme Construction has just completed the construction of a building, and Fred Jones, the project manager, is doing the final accounting. Acme bid $232,500 for the project and was awarded a contract for that amount. The cost of construction, including labor, building materials, and other expenses such as equipment rental was $198,468. What was the profit on this project?The total amount of profit is $.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
Consider the diagram. which line segment has the same measure as st? rx tx sr xs
Answers: 3
question
Mathematics, 21.06.2019 18:00
Find the multiplicative inverse of 8-12i
Answers: 2
question
Mathematics, 21.06.2019 18:20
What are the solution(s) to the quadratic equation x2 – 25 = 0? o x = 5 and x = -5ox=25 and x = -25o x = 125 and x = -125o no real solution
Answers: 2
question
Mathematics, 21.06.2019 19:00
Acompany manufactures large valves, packed in boxes. a shipment consists of 1500 valves packed in 75 boxes. each box has the outer dimensions 1.2 x 0.8 x 1.6 m and the inner dimensions 1.19 x 0.79 x 1.59 m. the boxes are loaded on a vehicle (truck + trailer). the available capacity in the vehicle combination is 140 m3. each valve has a volume of 0.06 m3. - calculate the load factor on the box level (%). - calculate the load factor on the vehicle level (%). - calculate the overall load factor (%).
Answers: 1
You know the right answer?
Profit is the amount of money that remains after all expenses of a project have been paid. Acme Cons...
Questions
question
Social Studies, 12.08.2020 06:01
question
Chemistry, 12.08.2020 06:01
question
Engineering, 12.08.2020 06:01
question
English, 12.08.2020 06:01
Questions on the website: 13722363