subject
Mathematics, 15.10.2020 07:01 hernandez48tur

A firm makes bulldozers (B), cranes (C) and tractors (T) at two locations, New York City (NYC) and Los Angeles (LA). The matrices below show the number of each item made in each location for the months of January (J) and February (F). B C T
J = NYC 144 474 274
LA 598 572 302

B C T
F = NYC 424 492 546
LA 596 530 164

Required:
Suppose the production for March of all products at all locations was the average of the January and February production. Write an expression using the matrices J and F for the March production matrix M.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
The brain volumes (cm cubed) of 50 brains vary from a low of 904 cm cubed to a high of 1488 cm cubed. use the range rule of thumb to estimate the standard deviation s and compare the result to the exact standard deviation of 175.5 cm cubed, assuming the estimate is accurate if it is within 15 cm cubed
Answers: 2
question
Mathematics, 21.06.2019 19:30
If the ratio of sum of the first m and n terms of an ap is m2 : n2 , show that the ratio of its mth and nth terms is (2m − 1) : (2n − 1).
Answers: 3
question
Mathematics, 21.06.2019 21:30
Answer! if you don’t mind, can you explain
Answers: 1
question
Mathematics, 22.06.2019 01:10
An of a of 60. a of 36 is . isbe ?to .
Answers: 3
You know the right answer?
A firm makes bulldozers (B), cranes (C) and tractors (T) at two locations, New York City (NYC) and L...
Questions
question
Mathematics, 16.10.2019 20:50
Questions on the website: 13722363