subject
Mathematics, 12.10.2020 18:01 laylay120

Pb 4 A Bicycle shop assembles bicycles and unicycles. The bikes need 2 wheels, require 4 hours of labor to assemble, and bring
in 300$ or profit. The unicycles only need 1 wheel, require 1 hour of labor, and generate 100$ of profit. The shop has 60
wheels on hand and 80 hours of available labor. The owner wishes to maximize profit on the assumption that he can sell
all the units he assembles.
Let B = number of bikes to be assembled & is constrained by B>=0
Let U = number of unicycles to be assembled & is constrained by U>=0

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 12:50
Tori examined the pattern of exponents in the table. based on the pattern, which statements are true? check all that apply.
Answers: 2
question
Mathematics, 21.06.2019 16:30
An automated water dispenser fills packets with one liter of water on average, with a standard deviation of 5 milliliter. the manual says that after a year of operation the dispenser should be tested to see if it needs recalibration. a year later a number of filled packets are set aside and measured separately. it is found that the average packet now contains about 0.995 liters. does the dispenser need calibration? explain your answer.
Answers: 2
question
Mathematics, 21.06.2019 17:00
Ifurniture stores having a weekend sale and is offering 20% discount on patio chairs and table the sales tax on furniture is 6.25 using function composition how can you represent the total amount a that you would need to pay for this furniture that cost x dollars
Answers: 1
question
Mathematics, 21.06.2019 17:00
Measures of the angle of r, 31 s (x+4) t (3x+9)
Answers: 1
You know the right answer?
Pb 4 A Bicycle shop assembles bicycles and unicycles. The bikes need 2 wheels, require 4 hours of l...
Questions
Questions on the website: 13722362