subject
Mathematics, 25.09.2020 05:01 BFBtrent

A construction company needs to remove 3 5/6 tons of dirt from a construction site. They can remove 7/9 tons of dirt each hour. What is the total number of hours will it take to remove the dirt?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:40
If 24 people have the flu out of 360 people, how many would have the flu out of 900. choose many ways you could use proportion that david would use to solve this problem
Answers: 1
question
Mathematics, 21.06.2019 17:00
The tuition costs, c, for a local community college are modeled by c(h) = 250 + 200h, where h represents the number of credit hours taken. the local state university has tuition costs, s, modeled by the function s(h) = 300 + 180h. how many credit hours will a student have to take for the two tuition costs to be equal? round the answer to the nearest tenth of an hour.
Answers: 3
question
Mathematics, 21.06.2019 18:00
He that is measured at 220° is a reflex angle. the opposite angle is obtuse. find the measure of obtuse .
Answers: 1
question
Mathematics, 21.06.2019 18:30
In right ∆abc shown below, the midpoint of hypotenuse ac is located at d and segment bd is drawn.if ab = 12 and bc = 16, then explain why bd = 10. hint: consider what you know about the diagonals of a rectangle.
Answers: 2
You know the right answer?
A construction company needs to remove 3 5/6 tons of dirt from a construction site. They can remove...
Questions
Questions on the website: 13722363