subject
Mathematics, 23.09.2020 16:01 carrillo4444

The line plot shows the number of hours students spent doing their math homework last week. A dot plot titled math homework time shows the number of hours spent doing homework. The data is as follows: 1 dot above 2, 2 dots above 2.5, 1 dot above 3, 2 dots above 4, 3 dots above 4.5, 1 dot above 5, and 2 dots above 5.5

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Apositive number a or the same number a increased by 50% and then decreased by 50% of the result?
Answers: 3
question
Mathematics, 22.06.2019 00:10
A50-foot ladder is leaning against a vertical wall. if the base of the ladder is 45 feet from the base of the wall, find the angle the bottling of the ladder makes with the ground.
Answers: 1
question
Mathematics, 22.06.2019 01:30
Robert is placing sod in two square shaped areas of his backyard. one side of the first area is 7.5 feet. one side of the other area is 5.7 feet. the sod costs y dollars per square foot
Answers: 3
question
Mathematics, 22.06.2019 01:30
Ineed with question three. i don't understand how i'm supposed to achieve 3 marks.
Answers: 2
You know the right answer?
The line plot shows the number of hours students spent doing their math homework last week. A dot p...
Questions
question
Mathematics, 27.03.2021 22:00
question
Mathematics, 27.03.2021 22:00
Questions on the website: 13722362