subject
Mathematics, 23.09.2020 04:01 Smays6903

6. A tube well is bored 800 meters deep. The 1" meter costs $250 and the cost per meter increases by $50 for every subsequent meter.
a) Find the cost of boring the 750 meter

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 20:00
Michael is training for a marathon. in his first week he plans to run 8miles. what path should he take
Answers: 1
question
Mathematics, 21.06.2019 20:30
I’m on question 7 it says a covered water tank is in the shape of a cylinder the tank has a 28 inch diameter and a height of 66 inches to the nearest square inch what is the surface area of the water tank
Answers: 2
question
Mathematics, 22.06.2019 00:30
Ineed to find the answer to number 2
Answers: 2
question
Mathematics, 22.06.2019 01:30
What is the surface area of a cube with the volume of 729 ft?
Answers: 1
You know the right answer?
6. A tube well is bored 800 meters deep. The 1" meter costs $250 and the cost per meter increases b...
Questions
question
Mathematics, 16.10.2020 23:01
question
Social Studies, 16.10.2020 23:01
question
History, 16.10.2020 23:01
question
English, 16.10.2020 23:01
question
Mathematics, 16.10.2020 23:01
Questions on the website: 13722367