subject
Mathematics, 20.09.2020 15:01 raveransaw

A contractor bought 12.6 ft2 of sheet metal. She has used 3.7ft2 so far and has $267 worth of sheet metal remaining. The equation 12.6x - 3.7x = 267 represents how much sheet metal is remaining and the cost of the remaining amount. How much does sheet metal cost per square foot?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Suppose a pendulum is l meters long. the time,t,in seconds that it tales to swing back and forth once is given by t=2.01
Answers: 1
question
Mathematics, 21.06.2019 18:10
The means and mean absolute deviations of the individual times of members on two 4x400-meter relay track teams are shown in the table below. means and mean absolute deviations of individual times of members of 4x400-meter relay track teams team a team b mean 59.32 s 59.1 s mean absolute deviation 1.5 s 245 what percent of team b's mean absolute deviation is the difference in the means? 9% 15% 25% 65%
Answers: 2
question
Mathematics, 21.06.2019 20:30
Asmall business produces and sells balls. the fixed costs are $20 and each ball costs $4.32 to produce. each ball sells for $8.32. write the equations for the total cost, c, and the revenue, r, then use the graphing method to determine how many balls must be sold to break even.
Answers: 1
question
Mathematics, 21.06.2019 23:30
What is the ratio for the surface areas of the cones shown below, given that they are similar and that the ratio of their radii and altitudes is 2: 1? submit
Answers: 1
You know the right answer?
A contractor bought 12.6 ft2 of sheet metal. She has used 3.7ft2 so far and has $267 worth of sheet...
Questions
question
Geography, 18.06.2020 13:57
question
Social Studies, 18.06.2020 13:57
question
Mathematics, 18.06.2020 13:57
question
Mathematics, 18.06.2020 13:57
question
Mathematics, 18.06.2020 13:57
question
English, 18.06.2020 13:57
Questions on the website: 13722363