Mathematics, 20.09.2020 08:01 jujusmith2022
During construction the workers need to mix dried bentonite into the concrete as it is being mixed to get the desired consistency. The workers decide to mix 800 mg of bentonite to be mixed with 198 lb of concrete mixed every 8 hours. The information for the concrete shows that 25-75 mg/kg per day is the appropriate mixture consistency. Are the workers within the desired range?
Answers: 3
Mathematics, 21.06.2019 17:00
High schoolmathematics 5 points keith is the leading goal scorer for a team in an ice hockey league. last season, he scored 42 goals in 82 games. assuming he scores goals at a constant rate, what is the slope of the line that represents this relationship if the number of games is along the x-axis and the number of goals is along the y-axis?
Answers: 1
Mathematics, 21.06.2019 21:30
What does independent variable and dependent variable mean in math?
Answers: 2
Mathematics, 22.06.2019 00:30
Astrid spent $36 on new shoes. this was $12 less than twice what she spent on a new skirt. part a: which equation would solve for how much she spent on the skirt? part b: solve the equation in the workspace provided below. how much did astrid spend on her skirt?
Answers: 1
Mathematics, 22.06.2019 01:30
In a sale there is 25% of all prices a chair costs Ā£45 in sale how much was it before the sale
Answers: 1
During construction the workers need to mix dried bentonite into the concrete as it is being mixed t...
Mathematics, 06.05.2021 22:50
Mathematics, 06.05.2021 22:50
Mathematics, 06.05.2021 22:50
Mathematics, 06.05.2021 22:50
Mathematics, 06.05.2021 22:50
Chemistry, 06.05.2021 22:50
Mathematics, 06.05.2021 22:50
Mathematics, 06.05.2021 22:50
Chemistry, 06.05.2021 22:50
Mathematics, 06.05.2021 22:50
Mathematics, 06.05.2021 22:50
Chemistry, 06.05.2021 22:50