subject
Mathematics, 28.08.2020 20:01 kdelisa

20.0% Complete You work on a manufacturing line. Currently, the status board for the line says"-55" This means that your line still needs to produce 55 items to meet the day's goal. Q. If your line produces 30 items in the next hour, what number will be displayed on the status board? A. 25 B. 85 C. -25 D. -85

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
The volume of a cube is 8 in to the 3rd power. how long is each side?
Answers: 1
question
Mathematics, 21.06.2019 23:30
Dawn is selling her mp3 player for 3 4 of the original price. the original price for the mp3 player was $40. how much is she selling her mp3 player for?
Answers: 1
question
Mathematics, 22.06.2019 00:10
A50-foot ladder is leaning against a vertical wall. if the base of the ladder is 45 feet from the base of the wall, find the angle the bottling of the ladder makes with the ground.
Answers: 1
question
Mathematics, 22.06.2019 02:50
Aci is desired for the true average stray-load loss μ (watts) for a certain type of induction motor when the line current is held at 10 amps for a speed of 1500 rpm. assume that stray-load loss is normally distributed with σ = 2.3. (round your answers to two decimal places.)
Answers: 1
You know the right answer?
20.0% Complete You work on a manufacturing line. Currently, the status board for the line says"-55"...
Questions
question
Mathematics, 04.11.2021 18:20
Questions on the website: 13722362