subject
Mathematics, 28.08.2020 14:01 calmicaela12s

E LEVEL 5. 35 workers are employed to complete a construction
project in 16 days. Before the project starts, the boss
of the company is told that he needs to complete
the project in 14 days. Assuming that all the workers
work at the same rate, how many more workers does
he need to employ in order to complete the project
on time?

P. S: I need this answer with Proportion (Direct/Inverse) method

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 20:40
The roots of the function f(x) = x2 – 2x – 3 are shown. what is the missing number?
Answers: 2
question
Mathematics, 21.06.2019 22:30
The party planning committee has to determine the number of tables needed for an upcoming event. if a square table can fit 8 people and a round table can fit 6 people, the equation 150 = 8x + 6y represents the number of each type of table needed for 150 people.
Answers: 1
question
Mathematics, 21.06.2019 23:50
What is the probably of getting heads when poing a coin and getting a number greater than or equal to 5 when rolling a single diea) 1/6b) 1/3c) 1/4d) 1/12
Answers: 2
question
Mathematics, 22.06.2019 02:30
An incoming airplane is x miles due north from the control tower at an airport. a second incoming airplane is y miles due east of the same control tower. the shortest distance between the two airplanes is z miles. which of the following functions would best model the situation above?
Answers: 1
You know the right answer?
E LEVEL 5. 35 workers are employed to complete a construction
project in 16 days. Before the p...
Questions
question
Mathematics, 10.05.2021 16:10
question
Mathematics, 10.05.2021 16:10
Questions on the website: 13722361