subject
Mathematics, 16.08.2020 01:01 Roselyn0131

There is a job that needs to be done. Bob can complete the job in 10 days alone, Jeff can complete the job in 15 days alone. Bob and Jeff work together for 4 days. Then Jeff has to finish the rest. How many more days does Jeff need?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Simplify this expression.2(10) + 2(x – 4) a. 2x + 16 b. x + 12 c. 2x + 12 d. x + 16
Answers: 2
question
Mathematics, 21.06.2019 18:00
Adj has a total of 1075 dance and rock songs on her system. the dance selection is 4 times the size of the rock selection. write a system of equations to represent the situation.
Answers: 1
question
Mathematics, 21.06.2019 19:40
Afactory makes propeller drive shafts for ships. a quality assurance engineer at the factory needs to estimate the true mean length of the shafts. she randomly selects four drive shafts made at the factory, measures their lengths, and finds their sample mean to be 1000 mm. the lengths are known to follow a normal distribution whose standard deviation is 2 mm. calculate a 95% confidence interval for the true mean length of the shafts. input your answers for the margin of error, lower bound, and upper bound.
Answers: 3
question
Mathematics, 21.06.2019 21:10
If f(x) = 2x + 8 and g(x) = x4, what is (gº)?
Answers: 1
You know the right answer?
There is a job that needs to be done. Bob can complete the job in 10 days alone, Jeff can complete t...
Questions
question
Mathematics, 06.11.2020 17:50
question
Mathematics, 06.11.2020 17:50
Questions on the website: 13722360