subject
Mathematics, 16.08.2020 01:01 kingjustin0825

Pete the Handyman Pete is a flooring contractor, he sets floor tile for a living. Pete submits a bid for each new job. Every
time he bids for a job, he measures the area of the floor that he will tile and then determines how
much material he will need. He charges the following prices for each job:
Foxed fee:
Labor and tile charge:
$250.00 (includes adhesive and grou)
$7.50 per
x will represent the number of square feet. y will represent the total cost of the project.
1.
Which equation represents Pete's bid?
y = 7.50x + 250
С.
y = 250x + 7.50
b.
y = 750x + 2.50
y= 2.50x = 750

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
What is the difference between the points (4, 7) and (4, -5)? a. 0 units b. 2 units c. 4 units d. 12 units
Answers: 1
question
Mathematics, 21.06.2019 22:30
Atotal of 766 tickets were sold for the school play. they were either adult tickets or student tickets. there were 66 more student tickets sold than adult tickets. how many adult tickets were sold?
Answers: 1
question
Mathematics, 21.06.2019 23:00
Susie wants to take her friend out for lunch.she wants to spend $9.75 each person. how much will she spend in all.
Answers: 2
question
Mathematics, 21.06.2019 23:30
Side xy of triangle xyz is extended to point w, creating a linear pair with ∠wyz and ∠xyz. measure of an exterior angle what is the value of x? 64 80 100 180
Answers: 2
You know the right answer?
Pete the Handyman Pete is a flooring contractor, he sets floor tile for a living. Pete submits a bi...
Questions
question
Mathematics, 17.06.2021 17:10
question
Mathematics, 17.06.2021 17:10
question
Mathematics, 17.06.2021 17:10
Questions on the website: 13722362