Mathematics, 31.07.2020 01:01 rar79
To estimate the long-term settlement of a footing, a geotechnical engineer uses the total load on the footing calculated by summing the dead load of the structure and the live load (loads imposed by furniture and occupancy). Because each is the sum of many relatively small weights, the engineer assumes that the dead load (X) and the live load (Y) are normally distributed. He collected data from numerous buildings of a similar type and found that the mean and the standard deviation of X are 100 kips and 10 kips, respectively, and the mean and the standard deviation of Y are 40 kips and 10 kips, respectively. Assuming that the design load is the total load for which the exceeding probability is 5%. Determine the design load.
Answers: 2
Mathematics, 21.06.2019 14:30
Part a : solve -vp + 40 < 65 for v part b : solve 7w - 3r = 15 for r show your work .
Answers: 3
Mathematics, 21.06.2019 16:50
For the equations below which statement is true ? -2x=14 6x=-42
Answers: 1
Mathematics, 21.06.2019 21:20
Find the distance from the theater to the library. leave your answer in simplest radical form if necessary. 12 √12 74 √74
Answers: 2
Mathematics, 21.06.2019 21:30
Using the information in the customer order, determine the length and width of the garden. enter the dimensions. length: feet width: feet
Answers: 3
To estimate the long-term settlement of a footing, a geotechnical engineer uses the total load on th...
Mathematics, 23.03.2020 03:15
Mathematics, 23.03.2020 03:16
Mathematics, 23.03.2020 03:16
Mathematics, 23.03.2020 03:16
Biology, 23.03.2020 03:16
Mathematics, 23.03.2020 03:17
Mathematics, 23.03.2020 03:17
Mathematics, 23.03.2020 03:17
Biology, 23.03.2020 03:17
Mathematics, 23.03.2020 03:18
Mathematics, 23.03.2020 03:18
French, 23.03.2020 03:18
Biology, 23.03.2020 03:18
Mathematics, 23.03.2020 03:18
Mathematics, 23.03.2020 03:18