subject
Mathematics, 15.07.2020 21:01 elijahronda

On a coordinate plane, a piecewise function has 3 lines. The first line has an open circle at (negative 9, negative 2), continues horizontally at y = negative 2, then has an open circle at (0, negative 2). The second line has an open circle at (0, 1), continues up with a positive slope, then has an open circle at (4, 9). The third line has an open circle at (4, negative 2), continues down with a negative slope, then has an open circle at (8, negative 4). What is the domain indicated on the graph for each portion of the piecewise function? f(x) = StartLayout enlarged left-brace 1st Row 1st column negative 2, 2nd column Domain 1st piece 2nd row 1st column 2 x + 1, 2nd column Domain 2nd piece Third row 1st column negative one-half x, 2nd column Domain 3rd piece EndLayout 1st piece: 2nd piece: 3rd piece:


On a coordinate plane, a piecewise function has 3 lines. The first line has an open circle at (nega

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Arefrigeration system at your company uses temperature sensors fixed to read celsius (°c) values, but the system operators in your control room understand only the fahrenheit scale. you have been asked to make a fahrenheit (°f) label for the high temperature alarm, which is set to ring whenever the system temperature rises above –10°c. what fahrenheit value should you write on the label
Answers: 1
question
Mathematics, 21.06.2019 21:00
If 30 lb of rice and 30 lb of potatoes cost ? $27.60? , and 20 lb of rice and 12 lb of potatoes cost ? $15.04? , how much will 10 lb of rice and 50 lb of potatoes? cost?
Answers: 1
question
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
question
Mathematics, 21.06.2019 23:30
Express -5 2/5 as an improper fraction.
Answers: 2
You know the right answer?
On a coordinate plane, a piecewise function has 3 lines. The first line has an open circle at (negat...
Questions
question
Chemistry, 06.04.2020 19:33
question
Biology, 06.04.2020 19:33
Questions on the website: 13722363