subject
Mathematics, 23.06.2020 17:01 snowww5492

Greenville Cabinets received a contract to produce speaker cabinets for a major speaker manufacturer. The contract calls for the production of 3,500 bookshelf speakers and 4,300 floor speakers over the next two months, with the following delivery schedule:Model Month 1 Month 2 Bookshelf 2,200 1,300 Floor 1,600 2,700 Greenville estimates that the production time for each bookshelf model is 0.7 hour and the production time for each floor model is 1 hour The raw material costs are $11 for each bookshelf model and $13 for each floor model. Labor costs are $23 per hour using regular production time and $34 using overtime. Greenville has up to 2,500 hours of regular production time available each month and up to 1,100 additional hours of overtime available each month. If production for either cabinet exceeds demand in month 1, the cabinets can be stored at a cost of $6 per cabinet. For each product, determine the number of units that should be manufactured each month on regular time and on overtime to minimize total production and storage costs. If required, round your answers to the nearest whole number. Regular Time Manufacture Model Month 1 Month 2 Bookshelf 2200 X 1300 Floor 1800 x 2500 Over Time ManufactureModel Month 1 Month 2 BookshelfFloor

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 21:00
Joanie watched 1 out of three of a movie in the morning
Answers: 1
question
Mathematics, 21.06.2019 23:00
Hormones perform important functions within the reproductive system. during puberty, a number of changes occur in the body. which hormone is responsible for the development of these characteristics in the female? estrogen progestin progesterone testosterone
Answers: 1
question
Mathematics, 21.06.2019 23:30
What is the value of x? enter your answer in the box.
Answers: 1
question
Mathematics, 22.06.2019 00:00
The probability that a tutor will see 0, 1, 2, 3, or 4 students is given below determine the probability distribution's missing value.
Answers: 1
You know the right answer?
Greenville Cabinets received a contract to produce speaker cabinets for a major speaker manufacturer...
Questions
question
Mathematics, 04.11.2019 23:31
question
Mathematics, 04.11.2019 23:31
Questions on the website: 13722367