subject
Mathematics, 20.06.2020 16:57 uhhgray

A production facility employs 10 workers on the day shift, 8 workers on the swing shift, and 6 workers on the graveyard shift. A quality control consultant is to select 4 of these workers for in-depth interviews. Suppose the selection is made in such a way that any particular group of 4 workers has the same chance of being selected as does any other group (drawing 4 slips without replacement from among 24). (a) How many selections result in all 4 workers coming from the day shift? What is the probability that all 4 selected workers will be from the day shift? (Round your answer to four decimal places.)
(b) What is the probability that all 4 selected workers will be from the same shift? (Round your answer to four decimal places.)
(c) What is the probability that at least two different shifts will be represented among the selected workers? (Round your answer to four decimal places.)
(d) What is the probability that at least one of the shifts will be unrepresented in the sample of workers? (Round your answer to four decimal places.)

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:10
Marcus needs to rewrite f(x) = x2 + 6x + 4 in vertex form.
Answers: 1
question
Mathematics, 21.06.2019 20:30
Suppose you just purchased a digital music player and have put 8 tracks on it. after listening to them you decide that you like 4 of the songs. with the random feature on your player, each of the 8 songs is played once in random order. find the probability that among the first two songs played (a) you like both of them. would this be unusual? (b) you like neither of them. (c) you like exactly one of them. (d) redo () if a song can be replayed before all 8 songs are played.
Answers: 2
question
Mathematics, 21.06.2019 20:30
You’re giving a cube with a length of 2.5 cm and a width of 2.5 cm and a high of 2.5 cm you place it on a scale and it is 295 g calculate the density
Answers: 1
question
Mathematics, 22.06.2019 04:30
Ribbon a is 1/3 meters long. it is 2/5 meters shorter than ribbon b. what's the total length of 2 ribbons?
Answers: 1
You know the right answer?
A production facility employs 10 workers on the day shift, 8 workers on the swing shift, and 6 worke...
Questions
question
Mathematics, 14.07.2020 03:01
question
Mathematics, 14.07.2020 03:01
question
Mathematics, 14.07.2020 03:01
question
Mathematics, 14.07.2020 03:01
Questions on the website: 13722362