Consider the following work breakdown structure: Time Estimates (days) LikelyPessimisticStartA, B - - - AC, D 44 50 56 BD 45 60 75 CE 42 45 48 DF 31 40 49 EF 27 36 39 FEnd 58 70 82 What is the probability that the critical path for this project will be completed within 210 days

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Given that ot =5, xt=12, and ox= 13 is xy tangent to circle o at t? explain.
Answers: 1
question
Mathematics, 21.06.2019 17:30
Asailor is looking at a kite. if he is looking at the kite at an angle of elevation of 36and the distance from the boat to the point where the kite is directly overhead is 40 feet, how high is the kite?
Answers: 1
question
Mathematics, 21.06.2019 18:00
List the sides of δrst in in ascending order (shortest to longest) if: a ∠r =x+28°, m∠s = 2x+16°, and m∠t = x+12°
Answers: 2
question
Mathematics, 21.06.2019 22:20
Cone a has a surface area of 384 ft2 and cone b has a surface area of 96 ft? . what is the ratio of their volume?
Answers: 1
You know the right answer?
Consider the following work breakdown structure: Time Estimates (days) LikelyPessimisticStartA, B -...
Questions
question
Mathematics, 30.08.2019 13:30
Questions on the website: 13722367