subject
Mathematics, 18.06.2020 14:57 LordBooming

A construction company is planning to bid on a building contract. The bid costs the company $1400. The probability that the bid is accepted is 1/4. If the bid is accepted, the company will make $17,600 minus the cost of the bid. What is the expected value in this situation?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 22:00
If my mom gets $13.05 an hour, and she works from 3: 30 to 10: 45 in the morning, how much money does my mom make?
Answers: 1
question
Mathematics, 22.06.2019 01:30
Here are the 30 best lifetime baseball batting averages of all time, arranged in order from lowest to highest: 0.319, 0.329, 0.330, 0.331, 0.331, 0.333, 0.333, 0.333, 0.334, 0.334, 0.334, 0.336, 0.337, 0.338, 0.338, 0.338, 0.340, 0.340, 0.341, 0.341, 0.342, 0.342, 0.342, 0.344, 0.344, 0.345, 0.346, 0.349, 0.358, 0.366 if you were to build a histogram of these data, which of the following would be the best choice of classes?
Answers: 3
question
Mathematics, 22.06.2019 02:00
What graph represents an even function
Answers: 1
question
Mathematics, 22.06.2019 02:30
An engineer is going to redesign an ejection seat for an airplane. the seat was designed for pilots weighing between 120 lb and 161 lb. the new population of pilots has normally distributed weights with a mean of 125 lb and a standard deviation of 28.1 lb. a)if a pilot is randomly selected, find the probability that his weight is between 120 lb and 161 lb.the probability is approximately? b. if 36 different pilots are randomly selected, find the probability that their mean weight is between 120 lb and 161 lb. the probability is approximately? c. when redesigning the ejection seat, which probability is more relevant? . part (b) because the seat performance for a single pilot is more important. b. part (b) because the seat performance for a sample of pilots is more important. c. part (a) because the seat performance for a sample of pilots is more important. d. part (a) because the seat performance for a single pilot is more important.
Answers: 3
You know the right answer?
A construction company is planning to bid on a building contract. The bid costs the company $1400. T...
Questions
question
Mathematics, 24.03.2021 01:50
question
Physics, 24.03.2021 01:50
question
Mathematics, 24.03.2021 01:50
question
Mathematics, 24.03.2021 01:50
question
Mathematics, 24.03.2021 01:50
question
English, 24.03.2021 01:50
question
Mathematics, 24.03.2021 01:50
Questions on the website: 13722363