Mathematics, 13.06.2020 18:57 AnaiyaKirksey8

A construction company has to complete a project no later than 4 months from now or there will be significant cost overruns. The manager of the construction company believes that there are four possible values for the random variable X, the number of months from now it will take to complete this project: 2, 2.5, 3, and 3.5. It is currently believed that the probabilities of these four possibilities are .6, .2, .1, and .1, respectively. What is the probability that the project took longer than expected?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
Adriveway is 60-feet long by 6-feet wide. the length and width of the driveway will each be increased by the same number of feet. the following expression represents the perimeter of the larger driveway: (x + 60) + (x + 6) + (x + 60) + (x + 6) which expression is equivalent to the expression for the perimeter of the larger driveway? a) 2(x + 66) b) 4x + 33 c) 4(x + 33) d) 4(x + 132)
Answers: 1
question
Mathematics, 21.06.2019 19:00
The lengths of all sides of a triangle are integers when measured in decimeters. one of the sides has length of 1 dm and another of 3 dm. find the perimeter of the triangle.'
Answers: 1
question
Mathematics, 21.06.2019 22:30
Aflagpole broke in a storm. it was originally 8 1 81 feet tall. 2 8 28 feet are still sticking straight out of the ground, where it snapped, but the remaining piece has hinged over and touches the ground some distance away. how far away is the end of the pole from the base of the pole along the ground?
Answers: 1
question
Mathematics, 22.06.2019 00:30
Proving the congruent supplements theorem
Answers: 3
You know the right answer?
A construction company has to complete a project no later than 4 months from now or there will be si...
Questions
question
English, 30.10.2019 17:31
Questions on the website: 13722361