subject
Mathematics, 05.06.2020 18:02 aramirez4785

At a furniture manufacturer, worker A can assemble a shelving unit in 5 hours. Worker B can assemble the same shelving unit in 3 hours. Which equation can be used to find t, the time in hours it takes for worker A and worker B to assemble a shelving unit together? Rate
(Shelving Units per Hour)
Time
(Hours)
Fraction Completed
Worker A
One-fifth
t

Worker B
One-third
t

5 t + 3 t = 1
One-fifth t minus one-third t = 1
One-fifth t + one-third t = 1
5 t minus 3 5 = 1

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 21:00
Joanie watched 1 out of three of a movie in the morning
Answers: 1
question
Mathematics, 22.06.2019 01:10
"curse these trig-loving pirates! " devora mutters as she looks at the map. then, after thinking for a moment, she walks back to the entrance of the secret cave, measuring 48 meters along the way. after performing a calculation, devora walks back to the empty treasure, faces the entrance, and turns a certain number of degrees to her left before walking 89 meters to the treasure. supposing that the angle at the cave entrance is acute and that devora's calculations were correct, how many degrees did she turn?
Answers: 2
question
Mathematics, 22.06.2019 02:30
Which statement illustrates the distributive property?
Answers: 2
question
Mathematics, 22.06.2019 03:20
If a=0.333333 and b=0.55555, what is the value of a+b
Answers: 1
You know the right answer?
At a furniture manufacturer, worker A can assemble a shelving unit in 5 hours. Worker B can assemble...
Questions
Questions on the website: 13722367