Mathematics, 30.05.2020 16:57 tangia
Ace Novelty wishes to produce three types of souvenirs: type A, B, C. To manufacture a type-A souvenir requires 2 minutes on machine I, 1 minute on machine II, and 2 minutes on machine III. A Type-B souvenir requires 1 minute on machine I, 3 minutes on machine II, and 1 minute on machine III. A type C souvenir requires 1 minute on machine I and 2 minutes each on machines II and III. There are 3 hours available on machine I, 5 hours available on machine II, and 4 hours on machine III, for processing the order. How many souvenirs of each type should Ace Novelty make in order to use all of the available time
Answers: 3
Mathematics, 21.06.2019 17:10
The graph of g(x) is a translation of y = which equation represents g(x)?
Answers: 1
Mathematics, 21.06.2019 17:30
Mickey needs to cut pieces of ribbon that are each 1 meter long tie onto balloons. if he has 8 pieces of ribbon that are each 1 dekameter long. how many 1 meter pieces of ribbon can he cut
Answers: 1
Mathematics, 21.06.2019 17:40
Which basic geometric term has no width, no length, and no thickness? line b. point c. angle d. plane
Answers: 2
Mathematics, 21.06.2019 18:30
Angela took a general public aptitude test and scored in the 88th percentile for aptitude in accounting. what percentage of the scores were at or below her score?
Answers: 2
Ace Novelty wishes to produce three types of souvenirs: type A, B, C. To manufacture a type-A souven...
History, 07.04.2021 22:30
English, 07.04.2021 22:30
Mathematics, 07.04.2021 22:40
Mathematics, 07.04.2021 22:40
Social Studies, 07.04.2021 22:40
Mathematics, 07.04.2021 22:40
Mathematics, 07.04.2021 22:40
Physics, 07.04.2021 22:40
Mathematics, 07.04.2021 22:40
History, 07.04.2021 22:40