A building contractor is to dig a foundation 48 feet long, 15 feet wide, and 9 feet deep. The contractor pays $25 per load for trucks to remove the dirt. Each truck holds 8 cubic yards. What is the cost to the contractor to have all the dirt hauled away?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:50
Factor -8x3-2x2-12x-3 by grouping what is the resulting expression?
Answers: 2
question
Mathematics, 21.06.2019 17:00
You have $600,000 saved for retirement. your account earns 5.5% interest. how much, to the nearest dollar, will you be able to pull out each month, if you want to be able to take withdrawals for 20 years?
Answers: 1
question
Mathematics, 21.06.2019 17:00
Acylinder and its dimensions are shown. which equation can be used to find v, the volume of the cylinder in cubic centimeters?
Answers: 1
question
Mathematics, 21.06.2019 18:00
The larger of two number is 4 less than twice the smaller number. the sum is 41. find the numbers
Answers: 2
You know the right answer?
A building contractor is to dig a foundation 48 feet long, 15 feet wide, and 9 feet deep. The contra...
Questions
question
Biology, 28.01.2021 21:20
question
History, 28.01.2021 21:20
question
History, 28.01.2021 21:20
question
Mathematics, 28.01.2021 21:20
question
Mathematics, 28.01.2021 21:20
question
French, 28.01.2021 21:20
Questions on the website: 13722363