Mathematics, 11.05.2020 08:57 gabyjr101
The State wants to build a power station along an East-West highway to supply power
to four small towns, A, B, C, & D located along the highway. Town C is 100 miles West of D and 85 miles East of B. Town A is 30 miles West of B. The cost of connecting the power station to any town in $1000 per mile of cable. The total budget cannot exceed $230,000. Where can the power station be located? You must provide a separate cable connection from the power station to each town.
Answers: 1
Mathematics, 21.06.2019 20:00
Which of these numbers of simulations of an event would be most likely to produce results that are closest to those predicted by probability theory? 15, 20, 5, 10
Answers: 2
Mathematics, 21.06.2019 21:00
Jordan got 27 out of 90 correct on his test . what fraction of the marks did her get correct
Answers: 2
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
The State wants to build a power station along an East-West highway to supply power
to four sm...
to four sm...
English, 06.09.2020 19:01
Physics, 06.09.2020 19:01
Chemistry, 06.09.2020 19:01
Mathematics, 06.09.2020 19:01
Mathematics, 06.09.2020 19:01
Biology, 06.09.2020 19:01
English, 06.09.2020 19:01
Chemistry, 06.09.2020 19:01
Advanced Placement (AP), 06.09.2020 19:01
Health, 06.09.2020 19:01
Social Studies, 06.09.2020 19:01
Mathematics, 06.09.2020 19:01