subject
Mathematics, 05.05.2020 06:22 brydenskl814

A computer manufacturer built a new facility for assembling computers. There were construction and new equipment costs. The company paid for these costs and made combined profits of $40 million after 4 years, while profits increased $30 million per year. Select the correct graph of this function. (2 points)

Group of answer choices

1)There is a graph of a line that has a y intercept that is approximately $80 million and passes through the point of approximately x equals 2 years and y equals $140 million.

2)There is a graph of a line that has a y intercept that is approximately negative $80 million and an x intercept that is approximately 2.7 years.

3)There is a graph of a line that has a y intercept that is approximately negative $45 million and an x intercept that is approximately 2 years.

4)There is a graph of a line that has a y intercept that is approximately negative $45 million and an x intercept that is approximately 0.6 years.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:50
Simplify 4 square root of 2 end root plus 7 square root of 2 end root minus 3 square root of 2 . (1 point) 2 square root of 8 8 square root of 2 8 square root of 6 6 square root of 8
Answers: 1
question
Mathematics, 21.06.2019 14:50
What is the volume of the sphere shown below with a radius of 3?
Answers: 1
question
Mathematics, 21.06.2019 19:30
Me max recorded the heights of 500 male humans. he found that the heights were normally distributed around a mean of 177 centimeters. which statements about max’s data must be true? a) the median of max’s data is 250 b) more than half of the data points max recorded were 177 centimeters. c) a data point chosen at random is as likely to be above the mean as it is to be below the mean. d) every height within three standard deviations of the mean is equally likely to be chosen if a data point is selected at random.
Answers: 2
question
Mathematics, 21.06.2019 21:00
Adesigner charges a one time fee of $200 plus $40 an hour for each project. write an expression to represent how much money the designer will make for a project
Answers: 1
You know the right answer?
A computer manufacturer built a new facility for assembling computers. There were construction and n...
Questions
question
Mathematics, 05.05.2021 21:40
question
History, 05.05.2021 21:40
Questions on the website: 13722367