Mathematics, 05.05.2020 08:27 jeff6284

Use the following to answer 21-22 The operations manager of a body and paint shop has five cars to schedule for repair. He would like to minimize the throughput time to complete all work on these cars. Each car requires body work prior to painting. The estimates of the times required to do the body paint work on each are as follows: Car Body Work (hours) Paint (hours) A 10 2 B 5 4 C 7 5 D 3 6 E 1 7 Q21) What is the optimum sequence (first car to last)

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:50
Which statement accurately explains whether a reflection over the x-axis and a 180° rotation would map figure acb onto itself?
Answers: 2
question
Mathematics, 21.06.2019 17:00
Two streets intersect at a 30- degree angle. at the intersection, the are four crosswalks formed that are the same length. what type of quadrilateral is formed by the crosswalks?
Answers: 2
question
Mathematics, 21.06.2019 17:30
Can someone me with this problem i don't understand i need
Answers: 2
question
Mathematics, 21.06.2019 20:00
I’m stuck on this equation, anyone got the answer?
Answers: 1
You know the right answer?
Use the following to answer 21-22 The operations manager of a body and paint shop has five cars to s...
Questions
question
Chemistry, 28.12.2019 17:31
question
Advanced Placement (AP), 28.12.2019 17:31
Questions on the website: 13722360