subject
Mathematics, 05.05.2020 18:20 Babymo

The manufacturer wishes to set up a control chart at the final inspection station for a gas water heater. Defects in workmanship and visual quality features are checked in this inspection. For the past 22 working days, 176 water heaters were inspected and a total of 924 nonconformities reported.

(a) What type of control chart would you recommend here, and how would you use it?

(b) Using two water heaters as the inspection unit, calculate the center line and control limits that are consistent with the past 22 days of inspection data.

(c) What is the probability of type I error for the control chart in part (b)?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
Myron put $5000 in a 2-year cd playing 3% interest, compounded monthly. after 2 years, he withrew all his money. what was the amount of the withdrawal?
Answers: 1
question
Mathematics, 21.06.2019 18:10
Which of these tables represents a non-linear function?
Answers: 1
question
Mathematics, 21.06.2019 19:00
If (x-2) 2= 49, then x could be a. -9 b. -7 c.- 2 d. 5 e.9
Answers: 2
question
Mathematics, 21.06.2019 21:10
(x-5)1/2+5=2 what is a possible solution?
Answers: 1
You know the right answer?
The manufacturer wishes to set up a control chart at the final inspection station for a gas water he...
Questions
question
History, 01.02.2020 03:44
question
Geography, 01.02.2020 03:44
Questions on the website: 13722360