subject
Mathematics, 06.05.2020 00:30 amadileaks

The overall project risk factor is known to be 0.5. The probability of dependency failure is twice the probability of complexity failure and four times the probability of maturity failure. The consequence of performance failure is twice the consequence of reliability failure, four times the consequence of schedule failure and eight times the consequence of cost failure. What is the difference between the probability of maturity failure and the consequence of cost failure

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
Apath 3 m wide runs around the inside of a square park inside 60 m.find the area of the path.pls
Answers: 2
question
Mathematics, 21.06.2019 17:00
The area of a rectangle is 54x^9y^8 square yards.if the length of the rectangle is 6x^3y^4 yards,which expression represents the width of the rectangle in yards
Answers: 2
question
Mathematics, 21.06.2019 19:00
Gh bisects fgi. find the measure of hgi •15° •21° •10° •8°
Answers: 2
question
Mathematics, 21.06.2019 20:00
M the table below represents a linear function f(x) and the equation represents a function g(x): x f(x)−1 −50 −11 3g(x)g(x) = 2x − 7part a: write a sentence to compare the slope of the two functions and show the steps you used to determine the slope of f(x) and g(x). (6 points)part b: which function has a greater y-intercept? justify your answer. (4 points)
Answers: 3
You know the right answer?
The overall project risk factor is known to be 0.5. The probability of dependency failure is twice t...
Questions
question
Mathematics, 18.06.2021 01:00
question
Mathematics, 18.06.2021 01:00
question
Mathematics, 18.06.2021 01:00
Questions on the website: 13722363