A construction company has an expenditure rate of E'(x)=e^(0.17 x) dollars per day on a particular paving job and an income rate of I'(x)=116.2 - e^(.17x) dollars per day on the same job, where x is the number of days from the start of the job. The company's profit on that job will equal total income less total expenditures. Profit will be maximized if the job ends at the optimum time, which is the point where the two curves meet.
(a) Find the optimum number of days for the job to last.
(b) Find the total income for the optimum number of days.
(c) Find the total expenditures for the optimum number of days.
(d) Find the maximum profit for the job.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Which composition of similarity transformations maps polygon abcd to polygon a'b'c'd'? a dilation with a scale factor less than 1 and then a reflection a dilation with a scale factor less than 1 and then a translation a dilation with a scale factor greater than 1 and then a reflection a dilation with a scale factor greater than 1 and then a translation
Answers: 3
question
Mathematics, 21.06.2019 17:00
The variable in a relation who’s value depends on the value of the independent variable is called what?
Answers: 1
question
Mathematics, 21.06.2019 20:30
There are 45 questions on your math exam. you answered 810 of them correctly. how many questions did you answer correctly?
Answers: 3
question
Mathematics, 21.06.2019 21:00
Gabriel determined that his total cost would be represented by 2.5x + 2y – 2. his sister states that the expression should be x + x + 0.5x + y + y – 2. who is correct? explain.
Answers: 3
You know the right answer?
A construction company has an expenditure rate of E'(x)=e^(0.17 x) dollars per day on a particular p...
Questions
question
Advanced Placement (AP), 09.09.2019 06:20
question
Mathematics, 09.09.2019 06:20
question
Mathematics, 09.09.2019 06:20
Questions on the website: 13722367