subject
Mathematics, 16.04.2020 04:56 nisha87

This question has several parts that must be completed sequentially. If you skip a part of the question, you will not receive any points for the skipped part, and you will not be able to come back to the skipped part. The acceleration function (in m/s2) and the initial velocity v(0) are given for a particle moving along a line. a(t) = 2t + 4, v(0) = βˆ’32, 0 ≀ t ≀ 6 Exercise (a) Find the velocity at time t. Step 1 The velocity function is the antiderivative of the acceleration. v(t) = (2t + 4) dt = $$ Correct: Your answer is correct. webMathematica generated answer key + C Step 2 We must determine the value of C. We know that v(0) = βˆ’32. Substituting 0 into our antiderivative gives βˆ’32 = v(0) = 0 Correct: Your answer is correct. seenKey 0 + C. Therefore, C = -32 Correct: Your answer is correct. seenKey -32 . Step 3 Therefore, what is the velocity function at time t? v(t) = $$ Your answer is correct. t^2+4t-32 m/s(b) Find the distance traveled during the given time interval. Step 1 The velocity function is v(t) = t2 + 4t βˆ’ 32, and so the distance traveled in the time interval 0 ≀ t ≀ 6 is given by 6 |t2 + 4t βˆ’ 32| dt 0 . Remembering that |z| = Incorrect: Your answer is incorrect. z β‰₯ 0 Incorrect: Your answer is incorrect. z < 0 , we must determine where v(t) = t2 + 4t βˆ’ 32 is positive or negative. v(t) can be factored as t2 + 4t βˆ’ 32 = t + 8

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
What is the value of x? enter your answer in the box. x = two intersecting tangents that form an angle of x degrees and an angle of 134 degrees.
Answers: 3
question
Mathematics, 21.06.2019 17:30
Add the fractions, and simply the result to lowest terms. 2/3 + 2/7= ?
Answers: 2
question
Mathematics, 21.06.2019 21:30
Apool measures 100 meters by 100 meters a toddler inside the pool and trows a ball 60 centimeters from one edge of the pool.how far is the ball from the opposite edge of the pool
Answers: 1
question
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
You know the right answer?
This question has several parts that must be completed sequentially. If you skip a part of the quest...
Questions
Questions on the website: 13722363