Mathematics, 16.04.2020 02:54 amber3687
A high-paced discount store in Los Angeles has noticed that checking errors have increased recently. They plan to use control charts with three standard deviation control limits to monitor the process. From previous sampling, they believe that the average number of errors is 5%. They decided to take a sample of 100 transactions over 10 days. The number of transactions in error for each day was 5, 7,6, 5, 6,4,6 3, 10, 8.
a. What is the center line for the p chart?
b. What is the upper control limit for a p chart?
c. What is happening to the process?
Answers: 3
Mathematics, 21.06.2019 21:00
Which line is parallel to the line that passes through the points (2, –5) and (–4, 1) a. y=-x+5 b. y=-2/3x+3 c. y=2/3x-2 d. y=x+5
Answers: 2
Mathematics, 21.06.2019 21:30
The length of a field is 100 yards and its width is 75 yards. if 1 inch represents 25 yards, what would be the dimensions of the field drawn on a sheet of paper?
Answers: 1
Mathematics, 21.06.2019 23:20
8litres of paint can cover 129.6 m². how much paint is required to paint an area of 243m²?
Answers: 3
A high-paced discount store in Los Angeles has noticed that checking errors have increased recently....
Mathematics, 18.02.2021 20:30
Mathematics, 18.02.2021 20:30
Mathematics, 18.02.2021 20:30
Mathematics, 18.02.2021 20:30
Business, 18.02.2021 20:30
English, 18.02.2021 20:30
Mathematics, 18.02.2021 20:30
Social Studies, 18.02.2021 20:30
Advanced Placement (AP), 18.02.2021 20:30
Mathematics, 18.02.2021 20:30
Mathematics, 18.02.2021 20:30