subject
Mathematics, 14.04.2020 21:20 solomander4

A large manufacturing plant has analyzed the amount of time required to produce an electrical part and determined that the times follow a normal distribution with mean time μ = 45 hours. The production manager has developed a new procedure for producing the part. He believes that the new procedure will decrease the population mean amount of time required to produce the part. After training a group of production line workers, a random sample of 25 parts will be selected and the average amount of time required to produce them will be determined. If the switch is made to the new procedure, the cost to implement the new procedure will be more than offset by the savings in manpower required to produce the parts. Use the hypothesis: H0: μ ≥ 45 hours and Ha: μ < 45 hours. If the sample mean amount of time is = 43.118 hours with the sample standard deviation s = 5.5 hours, give the appropriate conclusion, for α = 0.025.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:40
Although changes result from business transactions, the equality of the fundamental bookkeeping equation must remain. t/f
Answers: 2
question
Mathematics, 21.06.2019 18:30
Solve the system of equations y= 3/2 - 1, -x+ y =-3
Answers: 1
question
Mathematics, 21.06.2019 20:00
Write the expression as a single natural logarithm. 2 in a - 4 in y
Answers: 1
question
Mathematics, 21.06.2019 20:50
Samson is going shopping for sugar and butter to make three different kinds of cookies: lemon bars, peanut butter cookies, and sugar cookies. the recipe for lemon bars calls for 2 cups of flour, 2 cups of sugar, and 1 stick of butter. the peanut butter cookie recipe calls for 2 cups of flour, 4 cup of sugar and 2 stick of butter. the sugar cookie recipe calls for 1 cup of flour, 2 cups of sugar, and 2 sticks of butter. sampson has 13 cups of flour at home, and he buys 12 cups (6 pounds) of sugar and 10 sticks of butter. how many batches of each type of cookie can he make? samson can make batches of lemon bars, batches of peanut butter cookies, and batches of 09 cookies submit reset
Answers: 1
You know the right answer?
A large manufacturing plant has analyzed the amount of time required to produce an electrical part a...
Questions
question
English, 25.10.2020 02:20
question
Physics, 25.10.2020 02:20
Questions on the website: 13722363