subject
Mathematics, 09.04.2020 00:14 robert7248

Which describes how to construct a duplicate angle?
A.
Draw a starter ray; set the compass at length AB; place the compass at C; mark point D.

B.
Draw a starter ray; locate point C on starter line; draw an arc with center at A that intersects both sides of the angle; using same radius, draw an arc with center C; label points B, D, and E; draw an arc with radius BD at center E; label intersection F; draw ray CF.

C.
Draw a starter ray; duplicate the line segment on the ray; duplicate each angle using the two endpoints of the line segment as vertices of the angles; extend sides of angles.

D.
Draw a starter ray; locate point C on starter line; set the compass at length AB; draw an arc with center C all the way around.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
An episode of a television show is 60 minutes long when it originally airs with commercials. on a dvd without commercials, the episode is only 417 minutes long. how many1-minute commercials did the episode include when it originally aired? write and solve an equation to justify your answer.
Answers: 2
question
Mathematics, 21.06.2019 20:00
Someone answer asap for ! max recorded the heights of 500 male humans. he found that the heights were normally distributed around a mean of 177 centimeters. which statements about max’s data must be true? a. the median of max’s data is 250 b. more than half of the data points max recorded were 177 centimeters. c. a data point chosen at random is as likely to be above the mean as it is to be below the mean. d. every height within three standard deviations of the mean is equally likely to be chosen if a data point is selected at random.
Answers: 1
question
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
question
Mathematics, 22.06.2019 00:10
What is the best estimate of the length of a football
Answers: 1
You know the right answer?
Which describes how to construct a duplicate angle?
A.
Draw a starter ray; set the compas...
Questions
question
Business, 22.05.2020 00:11
question
Mathematics, 22.05.2020 00:11
question
Mathematics, 22.05.2020 00:11
question
Law, 22.05.2020 00:11
Questions on the website: 13722367