subject
Mathematics, 07.04.2020 16:22 4804053670

A manufacturing process is designed to produce bolts with a 0.75-inch diameter. Once each day, a random sample of 36 bolts is selected and the bolt diameters recorded. If the resulting sample mean is less than 0.730 inches or greater than 0.770 inches, the process is shut down for adjustment. The standard deviation for diameter is 0.04 inches. What is the probability that the manufacturing line will be shut down unnecessarily? (Hint: Find the probability of observing an x in the shutdown range when the true process mean really is 0.75 inches. Round your answer to four decimal places.)

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Find the equation of the trend line (line of best fit). show your work i'm using the points (34,76) (42,91)
Answers: 2
question
Mathematics, 21.06.2019 19:00
What is the factored form of the following expressions? d^2 – 13d + 36
Answers: 2
question
Mathematics, 22.06.2019 00:00
An equation in slope-intersept form the lines that passes thought (-8,1) and is perpindicular to the y=2x-17.
Answers: 1
question
Mathematics, 22.06.2019 00:40
Find the volume of the solid bounded by the plane z=0 and the paraboloid z=1-x^2 –y^2
Answers: 1
You know the right answer?
A manufacturing process is designed to produce bolts with a 0.75-inch diameter. Once each day, a ran...
Questions
question
Mathematics, 05.07.2019 06:00
question
Social Studies, 05.07.2019 06:00
Questions on the website: 13722361