subject
Mathematics, 03.04.2020 19:07 smelcher3900

TB MC Qu. 2-37 Longobardi Corporation bases its predetermined overhead ... Longobardi Corporation bases its predetermined overhead rate on the estimated labor-hours for the upcoming year. At the beginning of the most recently completed year, the Corporation estimated the labor-hours for the upcoming year at 45,800 labor-hours. The estimated variable manufacturing overhead was $6.19 per labor-hour and the estimated total fixed manufacturing overhead was $1,335,528. The actual labor-hours for the year turned out to be 43,800 labor-hours. The predetermined overhead rate for the recently completed year was closest to:

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:50
1. the wheeling bridge in west virginia is about 307 meters long. if you walk with a stride of about meter, about how many steps would it take you to cross this suspension bridge?
Answers: 1
question
Mathematics, 21.06.2019 18:30
Aswimming pool had 2.5 million liters of water in it. some water evaporated, and then the pool only had 22 million liters of water in it. what percent of the water evaporated?
Answers: 1
question
Mathematics, 21.06.2019 18:30
Which statement describes surface features called maria on the moon
Answers: 3
question
Mathematics, 21.06.2019 22:00
The numbers on a football field indicate 10 yard increments. you walk around the perimeter of a football field between the pylons. you walk a distance of 30623 yards. find the area and perimeter of the indicated regions. write your answers as mixed numbers, if necessary. a. one end zone: perimeter: yd area: yd2 b. the playing field (not including end zones): perimeter: yd area: yd2 c. the playing field (including end zones): perimeter: yd area: yd2
Answers: 1
You know the right answer?
TB MC Qu. 2-37 Longobardi Corporation bases its predetermined overhead ... Longobardi Corporation ba...
Questions
question
Mathematics, 30.08.2019 10:30
Questions on the website: 13722363