subject
Mathematics, 03.04.2020 15:52 amorosoavap5cejz

A worker on a scaffolding 75 ft above the ground needs to lift a 500 lb bucket of cement from the ground to a point 30 ft above the ground by pulling on a rope weighing 0.5 lb/ft. How much work is required

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:10
Apackage of bacon holds 15 strips of bacon. the pancake house uses 17 packages of bacon in the morning and 21 packages in the afternoon. how many more strips were used in the afternoon than the morning?
Answers: 1
question
Mathematics, 21.06.2019 19:00
The diagonals of a quadrilaretral intersect at (-1,4). one of the sides of the quadrilateral is bounded by (2,7) and (-3,5) determine the coordinates of the other side in order for the quadrilaretral to be a square.
Answers: 1
question
Mathematics, 21.06.2019 19:30
Zoey made 5 1/2 cups of trail mix for a camping trip. she wants to divide the trail mix into 3/4 cup servings. a. ten people are going on the trip. can zoey make enough 3/4 cup servings so that each person gets one serving? b. what size would the servings need to be for everyone to have a serving?
Answers: 1
question
Mathematics, 21.06.2019 20:20
The surface area of the triangular prism is .
Answers: 1
You know the right answer?
A worker on a scaffolding 75 ft above the ground needs to lift a 500 lb bucket of cement from the gr...
Questions
question
Mathematics, 07.06.2020 23:57
question
Mathematics, 07.06.2020 23:57
Questions on the website: 13722367