subject
Mathematics, 03.04.2020 08:49 veraanna2015

A company manufactures two different sizes of boat lifts. The smaller lift requires 1 hour in the welding department and 2 hours in the packaging department. The larger lift requires 3 hours in the welding department and 1 in the packaging department. The company has 150 hours/day available in welding and 120 hours/day available in packaging. If the profit is $25 for each small lift and $90 for each large lift, how many of each type should be produced to maximize profits? (1) List your variables (2) List your constraints

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:50
Expresa commuter train leaves downtown sation and travels at a average speed of 55 miles per hour towards the north side sation, which is 50miles away. thirty minutes later, express commuter train #7 leaves north side and travels at a average speed of 35miles per hour towards downtown sation. at the moment the two trains pass each other, how far(in miles) is train #12 from the downtown sation and how long(in minutes) has the #12 train been traveling
Answers: 1
question
Mathematics, 21.06.2019 23:10
What is the radius of the cone in the diagram? round your answer to the nearest whole number
Answers: 2
question
Mathematics, 22.06.2019 00:20
Data for the height of a model rocket launch in the air over time are shown in the table. darryl predicted that the height of the rocket at 8 seconds would be about 93 meters. did darryl make a good prediction? yes, the data are best modeled by a quadratic function. the value of the function at 8 seconds is about 93 meters. yes, the data are best modeled by a linear function. the first differences are constant, so about 93 meters at 8 seconds is reasonable. no, the data are exponential. a better prediction is 150 meters. no, the data are best modeled by a cubic function. a better prediction is 100 meters.
Answers: 2
question
Mathematics, 22.06.2019 00:30
If on=8x-8,lm=7x+4,nm=x-5,and ol=3y-6
Answers: 2
You know the right answer?
A company manufactures two different sizes of boat lifts. The smaller lift requires 1 hour in the we...
Questions
Questions on the website: 13722363