subject
Mathematics, 31.03.2020 02:03 wendisp54x2h

Smith is a weld inspector at a shipyard. He knows from keeping track of good and substandard welds that for the afternoon shift 5% of all welds done will be substandard. If Smith checks 300 of the 7500 welds completed that shift, what is the probability that he will find less than 20 substandard welds?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 13:50
Question and answers are in the attached picture. you so much in advance.
Answers: 3
question
Mathematics, 21.06.2019 18:00
Darian wants to build a regulation size pool table that is 9 feet in length.he plans he ordered are 18 by 36 inches. what is the scale factor of the dilation he must use to build a regulation pool table
Answers: 1
question
Mathematics, 21.06.2019 18:50
The first few steps in solving the quadratic equation 9x2 + 49x = 22 ? 5x by completing the square are shown. 9x2 + 49x = 22 ? 5x 9x2 + 54x = 22 9(x2 + 6x) = 22 which is the best step to do next to solve the equation by completing the square? 9(x2 + 6x + 3) = 25 9(x2 + 6x + 3) = 49 9(x2 + 6x + 9) = 31 9(x2 + 6x + 9) = 103
Answers: 3
question
Mathematics, 21.06.2019 20:00
Do,h = (7, 9) (14, 18) the scale factor is
Answers: 1
You know the right answer?
Smith is a weld inspector at a shipyard. He knows from keeping track of good and substandard welds t...
Questions
question
Mathematics, 01.04.2020 01:09
Questions on the website: 13722360