subject
Mathematics, 30.03.2020 20:11 lattimorekeonna1

A company found that an experienced surveyor can surver a roadbed in 3 hours. An apprentice needs 11 hours to survey the same stretch of road. if the two work together how long it takes them to complete the job

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Consider the reaction 2x2y2+z2β‡Œ2x2y2z which has a rate law of rate= k[x2y2][z2] select a possible mechanism for the reaction.
Answers: 2
question
Mathematics, 21.06.2019 17:50
On a string instrument, the length of a string varies inversely as the frequency of its vibrations. an 11-inch string has a frequency of 400 cylces per second. find the frequency of a 10-icnch string.
Answers: 2
question
Mathematics, 21.06.2019 21:50
Determine the common ratio and find the next three terms of the geometric sequence. 10, 2, 0.4, a. 0.2; -0.4, -2, -10 c. 0.02; 0.08, 0.016, 0.0032 b. 0.02; -0.4, -2, -10 d. 0.2; 0.08, 0.016, 0.0032 select the best answer from the choices provided a b c d
Answers: 1
question
Mathematics, 21.06.2019 23:40
What is the equation, in point-slope form, of the line that has a slope of 6 and passes through the point (–1, –8)? a. y+8 = 6 (x+1 )
Answers: 1
You know the right answer?
A company found that an experienced surveyor can surver a roadbed in 3 hours. An apprentice needs 11...
Questions
Questions on the website: 13722367