P = Predecessor S = Successor
This dependency states that you can start the successor af...
Mathematics, 25.03.2020 18:25 avelyp
P = Predecessor S = Successor
This dependency states that you can start the successor after you start the predecessor. There is overlap between the two activities because you don't require 100% of the predecessor to be complete before starting the successor. Creating overlap will shorten the schedule, but it also increases risk. If something happens in the predecessor that impacts what you've already built in the successor, you'll end up redoing the successor work. The assumption with the SS dependency is moving both activities to start as soon as possible.
Answers: 2
Mathematics, 21.06.2019 15:00
You put the following items into your rucksack. ham 600 g cheese 380 g tomatoes 270 g how much do all the ingredients weigh in total?
Answers: 1
Mathematics, 21.06.2019 15:30
Astore manager records the total visitors and sales, in dollars, for 10 days. the data is shown in the scatter plot. what conclusion can the store manager draw based on the data? question 3 options: an increase in sales causes a decrease in visitors. an increase in sales is correlated with a decrease in visitors. an increase in visitors is correlated with an increase in sales.
Answers: 1
Mathematics, 21.06.2019 18:30
Atriangle with all sides of equal length is a/an triangle. a. right b. scalene c. equilateral d. isosceles
Answers: 2
Mathematics, 21.06.2019 23:20
The graph of y=x3 is transformed as shown in the graph below. which equation represents the transformed function?
Answers: 1
Mathematics, 29.10.2020 16:20
English, 29.10.2020 16:20
History, 29.10.2020 16:20
Mathematics, 29.10.2020 16:20