subject
Mathematics, 23.03.2020 23:31 brae72

A contractor requires a cement mix that is 70% sand and 30% cement. He has 1400 kg of a cement mix that is 80% sand and 20% cement. How much cement should he add to this 1400 kg cement mix so that he gets the required mix?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
Toyland is having a sale. all items are 20% off. how much will you save on an item that usually sells for 95$ explain your
Answers: 1
question
Mathematics, 21.06.2019 16:30
Quadrilateral ghjk has vertices g(2, 3), h(8, 2), j(6, 8), and k(3, 6). it is transformed according to the rule t(–4, –5). what are the coordinates of g”? (–7, 3) (–2, 2) (–1, –7) (2, –2)
Answers: 2
question
Mathematics, 21.06.2019 21:30
Find the missing dimension extra points
Answers: 2
question
Mathematics, 22.06.2019 00:20
Match the following reasons with the statements given to create the proof. 1. do = ob, ao = oc sas 2. doc = aob given 3. triangle cod congruent to triangle aob vertical angles are equal. 4. 1 = 2, ab = dc if two sides = and ||, then a parallelogram. 5. ab||dc if alternate interior angles =, then lines parallel. 6. abcd is a parallelogram cpcte
Answers: 2
You know the right answer?
A contractor requires a cement mix that is 70% sand and 30% cement. He has 1400 kg of a cement mix t...
Questions
question
Social Studies, 31.08.2019 19:30
Questions on the website: 13722362