subject
Mathematics, 19.03.2020 02:32 Karamatullah

The total cost for a production process is equal to $1,000 plus two times the number of units produced. The mean and variance for the number of units produced are 500 and 900, respectively. Find the mean and variance of the total cost.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
The chs baseball team was on the field and the batter popped the ball up. the equation b(t)=80t-16•16+3.5 represents the height of the ball above the ground in feet as a function of time in seconds. how long will the catcher have to get in position to catch the ball before it hits the ground? round to the nearest second
Answers: 3
question
Mathematics, 21.06.2019 19:00
What is x and y intercepts for y=x+7
Answers: 1
question
Mathematics, 21.06.2019 20:40
Askate shop rents roller skates as shown on the table below. which graph and function models this situation?
Answers: 1
question
Mathematics, 21.06.2019 21:50
Determine the common ratio and find the next three terms of the geometric sequence. 10, 2, 0.4, a. 0.2; -0.4, -2, -10 c. 0.02; 0.08, 0.016, 0.0032 b. 0.02; -0.4, -2, -10 d. 0.2; 0.08, 0.016, 0.0032 select the best answer from the choices provided a b c d
Answers: 1
You know the right answer?
The total cost for a production process is equal to $1,000 plus two times the number of units produc...
Questions
question
Mathematics, 08.10.2021 07:50
question
Business, 08.10.2021 07:50
question
Mathematics, 08.10.2021 07:50
question
Computers and Technology, 08.10.2021 07:50
question
Mathematics, 08.10.2021 07:50
Questions on the website: 13722362