subject
Mathematics, 16.03.2020 21:58 bandiadummy8595

Working alone and at a constant rate, Machine A takes 3 hours to create a widget. Machine B, working alone and at a constant rate, takes x hours to create a widget. Working together, Machine A and B take 12 hours to build two widgets. What is the value of x?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
In the figure below, ∠dec ≅ ∠dce, ∠b ≅ ∠f, and segment df is congruent to segment bd. point c is the point of intersection between segment ag and segment bd, while point e is the point of intersection between segment ag and segment df. the figure shows a polygon comprised of three triangles, abc, dec, and gfe. prove δabc ≅ δgfe.
Answers: 1
question
Mathematics, 21.06.2019 22:10
Write the function for the graph. (1.8) (0,4)
Answers: 3
question
Mathematics, 21.06.2019 22:30
Ineed big ! the cost of a school banquet is $25 plus $15 for each person attending. create a table, sketch the graph, and write an equation in slope-intercept and point-slope form that gives total cost as a function of the number of people attending. what is the cost for 77 people?
Answers: 1
question
Mathematics, 21.06.2019 22:30
Solve: 25 points find the fifth term of an increasing geometric progression if the first term is equal to 7−3 √5 and each term (starting with the second) is equal to the difference of the term following it and the term preceding it.
Answers: 1
You know the right answer?
Working alone and at a constant rate, Machine A takes 3 hours to create a widget. Machine B, working...
Questions
question
History, 02.07.2019 09:00
question
Physics, 02.07.2019 09:00
Questions on the website: 13722360