Mathematics, 12.03.2020 06:40 ingridx0

16.4 A 12-station automated production line has an ideal cycle time of 24 sec. Line stops occur on average once every 20 cycles. When a line stop occurs, average downtime is 3.0 min. Cost of each starting work part is $1.55, and the cost to operate the line is $66/hr. Tooling cost is $0.13 per work part. Determine (a) average hourly production rate, (b) line efficiency, and (c) cost of a workpiece produced.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
The graph shows the distance y, in inches, a pendulum moves to the right (positive displacement) and to the left (negative displacement), for a given number of seconds x. how many seconds are required for the pendulum to move from its resting position and return? enter your answer in the box.
Answers: 2
question
Mathematics, 21.06.2019 16:30
The average human heart beats 1.15 \cdot 10^51.15â‹…10 5 1, point, 15, dot, 10, start superscript, 5, end superscript times per day. there are 3.65 \cdot 10^23.65â‹…10 2 3, point, 65, dot, 10, start superscript, 2, end superscript days in one year.how many times does the heart beat in one year? write your answer in scientific notation, and round to one decimal place.
Answers: 1
question
Mathematics, 21.06.2019 23:00
Someone answer this asap for the length, in feet, of a rectangular rug is represented by the expression 5x² + 2x. the width, in feet, is represented by the expression 3x². which expression represents the perimeter, in feet, of the rug? a. 8x² + 2x b. 8x² + 4x c. 16x² + 2x d. 16x² + 4x
Answers: 2
question
Mathematics, 22.06.2019 00:10
If sr is 4.5cm and tr is 3cm, what is the measure in degrees of angle s? a. 56.3 b. 33.7 c. 41.8 d. 48.2
Answers: 3
You know the right answer?
16.4 A 12-station automated production line has an ideal cycle time of 24 sec. Line stops occur on a...