A machine makes two components; call them types A and B. It takes 250 seconds to switch production between the component types. During that time, no production occurs. When in production, each unit of A or B requires 0.5 second to be completed. The two components, A and B, are combined in an assembly process to make a final product; call it C. The assembly step can combine the two components into 1 unit every 2 seconds, or 30 units per minute.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Match each equation with the operation you can use to solve for the variable. 1 subtract 10 2 divide by 10 3add 18 4add 10 5 subtact 18 6multiply by 5. 7multiply by 10. a 5 = 10p b p + 10 = 18 c p + 18 = 5 d 5p = 10
Answers: 3
question
Mathematics, 21.06.2019 16:30
What is the order of magnitude for the number of liters in a large bottle of soda served at a party
Answers: 2
question
Mathematics, 21.06.2019 19:30
Acar started driving from city a to city b, distance between which is 620 miles, at a rate of 60 mph. two hours later a truck left city b and started moving towards city a at a rate of 40 mph. how many hours after the truck's departure will the two meet?
Answers: 1
question
Mathematics, 21.06.2019 22:00
20 points 1. your friend, taylor, missed class today and needs some identifying solutions to systems. explain to taylor how to find the solution(s) of any system using its graph. 2. taylor graphs the system below on her graphing calculator and decides that f(x)=g(x) at x=0, x=1, and x=3. provide taylor some feedback that explains which part of her answer is incorrect and why it is incorrect. f(x)=2x+1 g(x)=2x^2+1
Answers: 2
You know the right answer?
A machine makes two components; call them types A and B. It takes 250 seconds to switch production b...
Questions
question
Mathematics, 27.03.2020 05:31
question
Mathematics, 27.03.2020 05:32
question
Mathematics, 27.03.2020 05:32
Questions on the website: 13722363