Mathematics, 12.03.2020 00:43 ella3714
The navy contract was for 2,314 devices and took 23 workers two weeks (40 hours per week) to complete. The army contract was for 4,707 devices that were produced by 16 workers in three weeks. What's the productivity of the army contract for the input of labor hours
Answers: 3
Mathematics, 21.06.2019 15:00
Which statement is always true? a. square bcdf is a rectangle. b. rectangle gjkm is a square. c. quadrilateral stpr is a trapezoid. d. parallelogram abcd is a rhombus.
Answers: 2
Mathematics, 21.06.2019 15:20
At the newest animated movie, for every 9 children, there are 4 adults. there are a total of 39 children and adults at the movie.
Answers: 2
Mathematics, 21.06.2019 19:40
Atextile fiber manufacturer is investigating a new drapery yarn, which the company claims has a mean thread elongation of 12 kilograms with a standard deviation of 0.5 kilograms. the company wishes to test the hypothesis upper h subscript 0 baseline colon mu equals 12 against upper h subscript 1 baseline colon mu less-than 12 using a random sample of n equals 4 specimens. calculate the p-value if the observed statistic is x overbar equals 11.8. round your final answer to five decimal places (e.g. 98.76543).
Answers: 3
Mathematics, 22.06.2019 01:00
Given the net of the rectangular prism, what is its surface area?
Answers: 1
The navy contract was for 2,314 devices and took 23 workers two weeks (40 hours per week) to complet...
Biology, 11.10.2019 19:30
Mathematics, 11.10.2019 19:30
English, 11.10.2019 19:30
Mathematics, 11.10.2019 19:30
Chemistry, 11.10.2019 19:30
Mathematics, 11.10.2019 19:30
Social Studies, 11.10.2019 19:30
Health, 11.10.2019 19:30
English, 11.10.2019 19:30