subject
Mathematics, 10.03.2020 08:06 yeidiyan9490

The following data relate to factory overhead cost for the production of 15,000 computers: Actual: Variable factory overhead $240,000 Fixed factory overhead 160,000 Standard: 19,500 hrs. at $20 390,000 If productive capacity of 100% was 20,000 hours and the total factory overhead cost budgeted at the level of 19,500 standard hours was $394,000, determine the variable factory overhead controllable variance, fixed factory overhead volume variance, and total factory overhead cost variance. The fixed factory overhead rate was $8.00 per hour. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
The amount of money, in dollars, in an account after t years is given by a = 1000(1.03)^t. the initial deposit into the account was $_^a0 and the interest rate was _a1% per year. only enter numbers in the boxes. do not include any commas or decimal points^t. the initial deposit into the account was $__^a0 and the interest rate is % per year.
Answers: 1
question
Mathematics, 21.06.2019 19:00
The width of a rectangle is 20 units. can the perimeter p of the rectangle be 64 units when its length x is 11 units? no, because p = 2x + 2(20) no, because p ≠ 2x + 2(20) yes, because p ≠ 2x + 2(20) yes, because p = 2x + 2(20)
Answers: 1
question
Mathematics, 21.06.2019 19:30
Complete the solution of the equation. find the value of y when x equals to 28 x+3y=28
Answers: 2
question
Mathematics, 21.06.2019 20:20
Convert the mixed numbers into improper fractions. convert the improper fraction to mixed numbers.
Answers: 1
You know the right answer?
The following data relate to factory overhead cost for the production of 15,000 computers: Actual: V...
Questions
question
Biology, 02.04.2020 23:07
question
Mathematics, 02.04.2020 23:07
question
Mathematics, 02.04.2020 23:08
Questions on the website: 13722361